IAI America SCON-CA User Manual
Page 121
Chapter 3 Operation
111
Note 1: Set the period taken from entering the position number to turning CSTR ON to 6ms or
longer. Because 6ms timer process on the PLC is also entered to the controller,
positioning at another position may occur. Take the PLC scan time into account.
Note 2: The Completed Position No. output is set to 0 during movement of the actuator.
T1�6ms
(Note 1)
PM1 to PM**�0
(Note 2)
PM1 to PM**�0
(Note 2)
Operation of actuator
Not turned ON for
miss-pressing
Approach operation
Pressing
operation
Pressing
Completion
Positioning be setting
of coordinate Value
Movement by
positioning
width
Stop of
pressing
Command position No.
PC1 to PC**
(PLC�Controller)
Completed position
PM1 to PM**
(Controller�PLC)
Start signal CSTR
(PLC�Controller)
Positioning Completion Signal
PEND
(Controller�PLC)
Turned OFF by
turning PEND OFF
Moving Signal MOVE
(Controller�PLC)
- ERC2 (138 pages)
- ERC2 (188 pages)
- ERC3 (438 pages)
- ERC (153 pages)
- RCA-E (53 pages)
- RCA-P (42 pages)
- RCB-101-MW (38 pages)
- RCP2-C (178 pages)
- RCS-E (102 pages)
- RCA-A4R (72 pages)
- RCA-RA3C (114 pages)
- RCA-SRA4R (56 pages)
- RCA2-RA2AC (100 pages)
- RCA2-SA2AC (92 pages)
- RCA2-TA4C (134 pages)
- RCD-RA1D (40 pages)
- RCP2-BA6 (72 pages)
- RCP2-GRSS (130 pages)
- RCP2-HS8C (126 pages)
- RCP2-RA2C (120 pages)
- RCP2-RTBS (80 pages)
- RCP2W-SA16C (46 pages)
- RCP3-RA2AC (60 pages)
- RCP4-RA5C (82 pages)
- RCP4-SA5C (94 pages)
- RCP4W (96 pages)
- RCS2-F5D (142 pages)
- RCS2-GR8 (46 pages)
- RCS2-RN5N (80 pages)
- RCS2-RT6 (60 pages)
- RCS2-SA4C (258 pages)
- RCS2-TCA5N (62 pages)
- RCL-SA1L (66 pages)
- RCL-RA1L (56 pages)
- RCLE-GR5L (46 pages)
- IK Series (16 pages)
- FS (84 pages)
- IF (76 pages)
- ISB (114 pages)
- ISDA (126 pages)
- ISDB (116 pages)
- ISPWA (90 pages)
- NS (78 pages)
- ICS(P)A (16 pages)
- RS (46 pages)