beautypg.com

IAI America SCON-CA User Manual

Page 103

background image

Chapter 3 Operation

93

[4] Home Return (HOME, HEND, PEND, MOVE)

Input

Output

PIO signal

HOME

HEND

PEND

MOVE

Patterns 0 and 1

Patterns 2 to 4

Pattern 5

Note1

Patterns 6 and 7

: Available, �: Unavailable

Note 1: For pattern 5, the home return by the HOME signal is not allowed. Refer to 3.2.6 [1]

Home Return (ST0, HEND) for how to perform a home-return operation.

The HOME signal is intended for automatic home return. The HOME signal is caught at the

rising edge (ON edge) to start the home return. At completion of the home return, home return

completion signal HEND is turned ON. The home-return complete signal HEND is kept on

unless the memory of origin point is lost for a reason. During the home return operation,

positioning completion signal PEND and moving signal MOVE are set to OFF and ON,

respectively.

Homing Completion Signal

HEND

(Controller→PLC)

Positioning Completion Signal

PEND

(Controller→PLC)

Moving Signal

MOVE

(Controller→PLC)

Home Return Signal

HOME

(PLC→Controller)