Fluke Biomedical 601PRO XL User Manual
Page 90

6 0 1 P R O S E R I E S
X L
4 - 1 0
☛
Note:
When executing the
Auto
sequence, the operator can press
the
NEXT
key once the DUT is ready to proceed with the
testing, or the operator can wait until the delay has
expired. Thus, by setting a much longer delay time in the
device record, the operator can accommodate DUTs with
variable startup.
• Enter the
Power Off Delay
:
baw090f.eps
A Power Off Delay is inserted between various tests in the
Step
and
Auto
sequences. The Power Off Delay is performed after power has been
removed from the DUT Outlet because the Outlet has been disabled, or
L2 has been opened. A Power Off Delay allows equipment time to stop
before being presented with a new power condition.
Press
ENT
.
☛
Note:
The minimum value of a Power Off Delay is 1 second.
☛
Note:
When executing the
Auto
sequence, the operator can press
the
NEXT
key once the DUT is ready to proceed with the
testing, or the operator can wait until the delay has
expired. Thus, by setting a much longer delay time in the
device record, the operator can accommodate DUTs with
variable power off times.
• Enter the
Number of Applied Part Leads
:
baw091f.eps
This selection allows the operator to define the number of applied parts
to be tested during Mains on Applied Part, Patient Leakage, Insulation
Resistance, and Patient Auxiliary Current tests. This screen will only
appear when the selected Test Standard is one of the following:
♦ IEC 601-1
♦ HEI 95
♦ Custom 1-4*
♦ AAMI*
♦ AS/NZS 3551
Press
ENT
.