beautypg.com

Fluke Biomedical 601PRO XL User Manual

Page 90

background image

6 0 1 P R O S E R I E S

X L

4 - 1 0

Note:

When executing the

Auto

sequence, the operator can press

the

NEXT

key once the DUT is ready to proceed with the

testing, or the operator can wait until the delay has

expired. Thus, by setting a much longer delay time in the

device record, the operator can accommodate DUTs with

variable startup.

• Enter the

Power Off Delay

:

baw090f.eps

A Power Off Delay is inserted between various tests in the

Step

and

Auto

sequences. The Power Off Delay is performed after power has been

removed from the DUT Outlet because the Outlet has been disabled, or

L2 has been opened. A Power Off Delay allows equipment time to stop

before being presented with a new power condition.
Press

ENT

.

Note:

The minimum value of a Power Off Delay is 1 second.

Note:

When executing the

Auto

sequence, the operator can press

the

NEXT

key once the DUT is ready to proceed with the

testing, or the operator can wait until the delay has

expired. Thus, by setting a much longer delay time in the

device record, the operator can accommodate DUTs with

variable power off times.

• Enter the

Number of Applied Part Leads

:

baw091f.eps

This selection allows the operator to define the number of applied parts
to be tested during Mains on Applied Part, Patient Leakage, Insulation
Resistance, and Patient Auxiliary Current tests. This screen will only
appear when the selected Test Standard is one of the following:

♦ IEC 601-1
♦ HEI 95
♦ Custom 1-4*
♦ AAMI*
♦ AS/NZS 3551

Press

ENT

.