Shortcut Key 2: Insulation Resistance Test

The Insulation Resistance Tests measure (in Megohms) the resistance from DUT

outlet L1 and L2 to DUT Earth, or from applied parts to DUT Earth. The

measurement is taken with a test voltage of 500 Volts DC. The test will not begin

until

START TEST

(

SOFT KEY 1

) is pressed. Once running, display values are

updated continuously and the unit will beep repeatedly as long as a test is active.

The test lasts for 60 seconds in

Manual

and

Step

modes, and 6 seconds when

running in

Auto

mode unless the operator terminates the test by pressing the

STOP

TEST

(

SOFT KEY 1)

or the

esc/stop

key.

Important:

This test is acceptable per IEC 601-1 for non-manufacturers' retesting

of devices. The standard specifically indicates that this test should not be carried
out at the full voltage
used by manufacturers to stress the DUT.

The front panel outlet is turned off during this test. The following conditions apply:

• L1 and L2 Open with 500VDC applied between L1 and L2 to Earth

To perform an

Insulation Resistance

test (L1 and L2 to Case) using the

shortcut

keys:

• From the

MAIN MENU

, or with the outlet unpowered, plug the DUT into the

601PRO front panel outlet with the DUT’s power switch ON.

• Attach the device's applied parts to the 601PRO's applied part terminals.
• Press

shortcut key 2

. The

Insulation Resistance

test is displayed:

baw050f.eps

• Press

START TEST

to start running the test.

SOFT KEY 1

starts or stops the test.

SOFT KEY 2

changes the test to AP to Insulation Resistance.

• The unit will beep repeatedly as long as the test is active.

• Press

STOP TEST

soft key to terminate the test.

Press the

print data

key at any time to generate a printout of the latest

measurement(s)

.

Important:

A 2-beep-per-second signal indicates high voltage

present at the DUT Outlet and at the applied part

terminals. In Auto Step tests, the applied parts

insulation resistance test will apply high voltage to all

l d