2. The Power-Up Sequence

baw133f.eps

The 601PRO immediately begins a self-check routine at power-up while the

following instrument identification screen is displayed:

baw003f.eps

Power-up tests include internal self-checks and wall outlet checks. If any of the

power-up tests fail, the 601PRO displays an error message. Refer to Chapter 11,

Error Messages, Troubleshooting, and Support, for additional information.

When diagnostics are completed, the

MAIN MENU

will appear

:

baw004f.eps

To repeat the self-check routine at any time, press

UTILITIES

from the

MAIN MENU

,

then

SYSTEM TEST

.

Note:

At power-up, the 601PRO determines the polarity of the Mains power. If

the Mains polarity is normal (normal for a grounded neutral system), L2 in

the DUT Outlet will be opened whenever a NO L2 condition exists, but if

the Mains polarity is reversed, L1 in the DUT Outlet will be opened

whenever a NO L2 condition exists. This ensures that the highest Mains

voltage remains connected to the device under test for a NO L2 single-

fault condition. The operator will not be notified at power-up if the Mains

Voltage is reversed.

Note:

At power-up, the number of applied parts will be set to zero (0) for all

standards except VDE 751, which will default to five (5) applied parts.