beautypg.com

Dual lead leakage – Fluke Biomedical 601PRO XL User Manual

Page 76

background image

6 0 1 P R O S E R I E S

X L

3 - 3 6

Dual Lead Leakage

Dual Lead Leakage

currents are measured between the RED and BLACK test leads.

Measurements may have either a true RMS or a DC-only response.

The Dual Lead

Leakage

test can

ONLY be accessed from the

Manual

menu.

To perform a

Dual Lead Leakage

test:

• From the

MAIN MENU

, or with the outlet unpowered, plug the DUT into the

601PRO front panel outlet, and turn on the device.

• Attach the RED test lead from the 601PRO to the device. A bare exposed metal

area or an applied part should be selected.

• Attach the BLACK test lead from the 601PRO to the device. A bare exposed

metal area should be selected.

• From the

MAIN MENU

, press

TESTS/AUTOMODES

, then

MANUAL

, then

*MORE

until

DUAL LEAD LEAKAGE

is displayed. Press

Dual Lead Leakage,

and the test begins immediately. Display values are continuously updated until

another test is selected.

baw065f.eps

• Press

SOFT KEYS 1-4

to select the desired configuration:

SOFT KEY 1

toggles the DUT outlet Polarity from Normal to DUT Off to

Reverse Polarity, or Reverse to DUT Off to Normal Polarity.

SOFT KEY 2

toggles the DUT outlet from Earth to No Earth.

SOFT KEY 3

toggles the DUT outlet from L2 to No L2.

SOFT KEY 4 toggles between RMS Leakage and DC Leakage.

• Press the

print data

key at any time to generate a printout of the latest

measurement.