beautypg.com

Level 30 system power-on procedure, Chapter 11 installing the level 30 storage system – Grass Valley K2 Storage System Instruction Manual v.3.2 Sep.24 2007 User Manual

Page 538

background image

538

K2 Storage System Instruction Manual

September 7, 2007

Chapter 11 Installing the Level 30 Storage System

Level 30 system power-on procedure

Power on Level

Level 30 (iSCSI) K2

Storage System

Power on and verify

control point PC

.

Refer to

page 540

for procedures.

Power on and verify

HP ProCurve switch

.

Refer to

page 539

for procedures.

Power on and verify

RAID devices

.

Refer to

page 539

for procedures.

Elapsed time: 5 minutes

Elapsed time: 1 minute

Power on the

K2 Media Server

.

From the control point PC, at
the command prompt, ping
the K2 Media Server.

Power on

K2 Media Clients

and other

iSCSI clients

.

Begin record/play operations.

Yes

Power on optional

NH servers

, if any.

From the control point PC, at
the command prompt, ping
the K2 Media Server.

Yes

K2

Media Server

responds to ping?

Elapsed time:

3 minutes

No

Level 30 K2 Storage

System power-on complete

K2

Media Server

responds to ping?

Elapsed time:

3 minutes

No

Begin FTP operations.