Level 30 system power-on procedure, Chapter 11 installing the level 30 storage system – Grass Valley K2 Storage System Instruction Manual v.3.2 Sep.24 2007 User Manual
Page 538
538
K2 Storage System Instruction Manual
September 7, 2007
Chapter 11 Installing the Level 30 Storage System
Level 30 system power-on procedure
Power on Level
Level 30 (iSCSI) K2
Storage System
Power on and verify
control point PC
.
for procedures.
Power on and verify
HP ProCurve switch
.
Refer to
for procedures.
Power on and verify
RAID devices
.
for procedures.
Elapsed time: 5 minutes
Elapsed time: 1 minute
Power on the
K2 Media Server
.
From the control point PC, at
the command prompt, ping
the K2 Media Server.
Power on
K2 Media Clients
and other
iSCSI clients
.
Begin record/play operations.
Yes
Power on optional
NH servers
, if any.
From the control point PC, at
the command prompt, ping
the K2 Media Server.
Yes
K2
Media Server
responds to ping?
Elapsed time:
3 minutes
No
Level 30 K2 Storage
System power-on complete
K2
Media Server
responds to ping?
Elapsed time:
3 minutes
No
Begin FTP operations.