Gate - stereo – ATEIS IDA8 User Manual
Page 446
![background image](https://www.manualsdir.com/files/772583/content/doc446.png)
ATEIS - IDA8
446
© 2012 ATEÏS
Adjusts the time between the level's detection and the beginning of the Gate operation.
Attack Time:
Adjusts the fade-in time of the signal when the Gate is working.
Hold Time:
Adjusts the time between the end level's detection and the end of the Gate operation.
Release Time:
Adjusts the fade-out time of the signal when the Gate is no longer working.
Depth:
Attenuates the level when the Gate is active.
6.4.8.2
Gate - Stereo
Component Template
Component Appearance: