Lull 6K Service Manual User Manual
Page 535

Frame Tilt and Oscillation
Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K
7-33
Removal
Oscillation Control Block
Fig. 7-21: Oscillation Control Block Installation
Rear Oscillation Lock Cylinder Installed on Machine
(Ref. Fig. 7-21) Use the following control block removal procedures when
the rear oscillation lock cylinder is installed on the machine. For removal
procedures when the cylinder has been removed, see page 7-34.
1. Follow preparation procedures as outlined in Section 3.
2. Place blocks between frame and top of rear axle. This will hold the
frame in place when the control block is removed.
3. Install brake pressure diagnostic port test gauge onto brake diagnostic
port.
4. While watching test gauge, press brake pedal numerous times until
pressure gauge reads 0 psi. Remove test gauge from diagnostic port.
8
6
7
5
3
4
9
K
103
0
2
1
#
Description
1
#6 Hydraulic Hose
2
#8 Hydraulic Hose
3
Capscrew
4
Lockwasher
5
Check Valve Cartridge
#
Description
6
Oscillation Control Block
7
O-Ring
8
Rear Oscillation Lock Cylinder
9
Electrical Lead
10 Pressure Reducing Valve
10