Lull 6K Service Manual User Manual
Page 313

Boom and Transfer
Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K
6-63
Fig. 6-57: Lower Shim Installation – Front of 2-Section Boom
4. (Ref. Fig. 6-57) Install/remove shim(s) under indicated pads to obtain
clearance specified in Step 3.
Fig. 6-58: Upper Shim Installation – Front of 2-Section Boom
5. (Ref. Fig. 6-58) Install/remove shim(s) under indicated pads to obtain
specified clearance.
J1046
Install shim(s) under
these pads
J1050
0.063"–0.125"
(1/16"–1/8") gap
between boom and
pads
Install shim(s)
under these pads
This manual is related to the following products: