Lull 6K Service Manual User Manual
Page 309

Boom and Transfer
Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K
6-59
Fig. 6-51: Quick Attach Pivot
5. (Ref. Fig. 6-51) Remove nut (Item 4), lockwasher (Item 3), and
capscrew (Item 2) from quick attach pivot pin (Item 1).
6. Remove quick attach pivot pin and shims (Item 5) (if installed).
7. Clean and inspect all parts for condition and wear. Replace as
necessary.
Installation
Quick Attach
1. Align quick attach (Item 6) to boom. Check gaps between quick attach
and boom. Select shims to center quick attach on boom.
2. (Ref. Fig. 6-51) Install quick attach pivot pin (Item 1) and shims
(Item 5). Secure pivot pin with capscrew (Item 2), lockwasher (Item 3),
and nut (Item 4).
3. (Ref. Fig. 6-50) Align rod-end of front carriage tilt cylinder with quick
attach. Install pivot pin and secure with lock pin, lockwasher, and
capscrew.
4. Lubricate grease fittings with EP lithium based grease.
J1068
4
3
2
1
6
5
5
#
Description
1
Pivot Pin
2
Capscrew
3
Lockwasher
#
Description
4
Nut
5
Shim
6
Quick Attach