Lull 6K Service Manual User Manual
Page 371

Boom and Transfer
Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K
6-121
Fig. 6-127: Front Slide Pads, Middle Boom
13. (Ref. Fig. 6-127) Install the front slide pads and shims in the middle
boom section according to drawing specifications. See “Shimming
Procedures” on page 6-91 for details.
a. Install the lower shims (Item 6) and slide pads (Item 5). Install each
pad retainer (Item 7) with a flatwasher (Item 8), lockwasher
(Item 9), and capscrew (Item 10). Torque the capscrew to 200 ft-
lbs.
b. Install each side shim (Item 4) and slide pad (Item 3) with two (2)
lockwashers (Item 2) and button head capscrews (Item 1). Torque
the capscrews to 65 ft-lbs.
Fig. 6-128: Rear Slide Pads, Inner Boom
J
1
287
#
Description
1
Button Head Socket Capscrew
2
Lockwasher
3
Side Slide Pad
4
Shim
5
Lower Slide Pad
#
Description
6
Shim
7
Pad Retainer
8
Flatwasher
9
Lockwasher
10 Capscrew
1 2
3
4
5
6
7
8
9
10
J
1
283
#
Description
1
Upper Slide Pad
2
Shim
3
Pad Retainer
4
Flatwasher
5
Lockwasher
#
Description
6
Capscrew
7
Shim
8
Slide Pad
9
Lockwasher
10 Button Head Socket Capscrew
1
2
3
4
5
6
7
8
9
10