Lull 6K Service Manual User Manual
Page 331

Boom and Transfer
Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K
6-81
Fig. 6-81: Extension Cylinder Rod End
5. (Ref. Fig. 6-81) Level the boom. Then loosen the two (2) setscrews
(Item 2) in the extension cylinder nut (Item 1). Remove the nut and
washer (Item 3).
6. (Ref. Fig. 6-81) For models with a 2" diameter rod in the boom
extension cylinder (Item 6), remove the cotter pin (Item 4). Models with
a 2.25" diameter rod do not have a cotter pin; proceed to Step 7.
Fig. 6-82: Hose Connections, 2-Section Boom
J
1
080
1
2
3
6
5
4
#
Description
1
Nut
2
Setscrew
3
Washer
#
Description
4
Cotter Pin
5
Mounting Block
6
Extension Cylinder
1
2
3
4
J
1071
#
Description
1
Auxiliary Hydraulic Hoses
2
Carriage Tilt Hoses
#
Description
3
Boom Extension Hoses
4
Boom Extension Cylinder
This manual is related to the following products: