Lull 6K Service Manual User Manual
Page 383

Boom and Transfer
Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K
6-133
38. (Ref. Fig. 6-141) Install the anchor base assembly to the bottom of the
middle boom section with six (6) lockwashers and capscrews. Install
the shortest capscrew in the hole illustrated above. Torque this
capscrew to 280 ft-lbs. Torque the other five (5) capscrews to 200 ft-
lbs.
Fig. 6-142: Front Slide Pads Installation, Outer Boom
39. (Ref. Fig. 6-142) Install the top and side slide pads and shims on the
outer boom section according to drawing specifications. See
“Shimming Procedures” on page 6-91 for details.
a. Install the shims and slide pads with two (2) each lockwashers and
button head socket capscrews.
b. Torque the capscrews to 65 ft-lbs.
0
80
6 0
4 0
2 0
- 2 0
J
1091
J
128
0
3
1
2
4
#
Description
1
Button Head Socket Capscrew
2
Lockwasher
#
Description
3
Shim
4
Slide Pad