Lull 6K Service Manual User Manual
Page 446

Boom and Transfer
6-196
Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K
Fig. 6-209: Hydraulic Hose and Tube Installation – Inner Boom Section
23. (Ref. Fig. 6-209) Install auxiliary and front carriage tilt cylinder
hydraulic hoses and tubes as follows:
a. Connect hydraulic hoses (Item 1) to carriage tilt hydraulic tubes
(Item 4). Torque swivel nuts on hydraulic tubes to 50–58 ft-lbs.
b. Connect hydraulic hoses (Item 2) to auxiliary hydraulic tubes
(Item 5). Torque swivel nuts on hydraulic tubes to 50–58 ft-lbs.
c. Install auxiliary and front carriage tilt hydraulic tubes on channels
(Item 6) in inside of inner boom section with cushion clamps
(Item 3) as described in Substep d under Step 2 on page 6-185.
24. Install front carriage tilt cylinder in inner boom (See page 6-19).
25. Install auxiliary hydraulic quick disconnects
J
1246
3
4
5
6
1
2
#
Description
1
Auxiliary Hydraulic Hoses
2
Carriage Tilt Hydraulic Hoses
3
Cushion Clamp
#
Description
4
Auxiliary Hydraulic Tubes
5
Carriage Tilt Hydraulic Tubes
6
Mounting Channel