beautypg.com

How to test machine control signals, 4 select the ‘machine control’ tab, Managing machine control ports – Grass Valley UniConfi NVISION Series v.1.3 User Manual

Page 121

background image

UniConfig Configuration Application • User’s Guide

109

11. Managing Machine Control Ports

Testing Machine Control Ports Switching

How to Test Machine Control Signals

1 Launch UniConfig. (See

Launching UniConfig

on page 9.)

2 Select a control card. (See

Selecting a Control Card

on page 10.)

3 From the menu bar, select ‘Window > Connections’. The ‘Connections’ window appears with

blank fields.

4 Select the ‘Machine Control’ tab:

Figure 11-5. Example of Connections Window with Machine Control Tab in Front

Each input is listed with its corresponding output.

5 In the ‘Physical Output Range’ section, enter a ‘Start’ and ‘End’ number in the fields provided

and click

Read Outputs

. The corresponding ports display on the tab.

If the ‘Machine Control’ tab is blank, perform a ‘Diagonal Take’ (step 7), connecting port 1 to
port 1, and so on. When ports are connected to themselves in this manner, the port’s connec-
tions are automatically tri-stated.

Note

Each control card must be configured separately.

Note

When the ‘Machine Control’ tab is selected, entries in the ‘Physical Output
Range’ and in ‘Single Take’ fields refer to machine control port numbers, not
physical input or output numbers on the frame.