KEYENCE DV-90 User Manual
Page 28

2-4
2
Initial Setup
of the Cod
e
Reade
r
E DV-90-IM
7
Wire the trigger input (input to starting reading).
⇒ Refer to 3-4.
• If a hand-held reader is connected, no wiring is required.
• For the BL-1300/700/600/180 Series and the SR-600/500, wire the trigger input to the DV-
90.
8
Wire the I/O terminals.
⇒ Refer to 3-2.
9
If you want to communicate with a device such as a PC or a PLC, connect the
DV-90 to the device.
⇒ Refer to 3-10.
For the communication control and operation methods according to the connected device, refer
to the following pages.
• PC (serial communication)
⇒
Refer to 8-1.
• PLC (PLC link)
⇒
Refer to 9-1.
10
Use the DV-90 and confirm its operation is correct.
The DV-90 setup and connections is complete.
See also other documents in the category KEYENCE Sensors:
- LR-TB2000 Series (12 pages)
- LR-TB5000 Series (12 pages)
- LR-ZB250AN/AP (4 pages)
- LR-ZB250AN/P (3 pages)
- LR-ZBxN/P Series (3 pages)
- LR-ZBxxB (3 pages)
- OP-85135 (1 page)
- PZ-G Series (2 pages)
- PZ-V/M (2 pages)
- PS-N10 Series (12 pages)
- PX-10 (10 pages)
- CZ-V21A(P) (10 pages)
- CZ-K1(P) (8 pages)
- CZ-V1 (8 pages)
- FS-N10 Series (6 pages)
- FS-N10 Series (116 pages)
- FS-N15CN (1 page)
- FU-93(Z) (2 pages)
- FU-V Series (2 pages)
- FS-V30 (6 pages)
- FU-A40 (1 page)
- NU/FS-N Series (16 pages)
- FS-V33(P) (8 pages)
- FS-V21 (4 pages)
- FS-V22 (4 pages)
- FS-V11(P) (4 pages)
- FS-V1(P) (4 pages)
- LV-N10 Series (12 pages)
- LV-N10 Series (112 pages)
- LV-S62 (1 page)
- OP-84350 (1 page)
- LV-SA (10 pages)
- LV-SB (12 pages)
- OP-87305 (1 page)
- LV Series (10 pages)
- LV-B102 (1 page)
- EV-108M(U) (1 page)
- EZ Series (1 page)
- EM Series (1 page)
- ES-M1(P) (3 pages)
- EX-V Series (120 pages)
- EX-500(W) Series (16 pages)
- GV Series (10 pages)
- IA Series (8 pages)
- LB-1000(W) (24 pages)