Metrohm IC Net 2.3 User Manual
Page 361
10.2 Perform batch reprocessing
IC Net 2.3
351
Reprocess calibration runs
Reprocess all calibration chromatograms
(
calibration level > 0
).
Update method file in
Save the method file
*.mtw
after reprocess-
ing if the method is changed.
Reintegrate
Reintegrate chromatograms according to
the current settings of the integration pa-
rameters and integration events.
Open the
Integration parameters
window for
modification of integration parameters and
integration events.
Recalibrate
Reprocess all calibration chromatograms (if
Reprocess calibration runs
is switched on)
and apply new calibration to all sample
chromatograms (if
Reprocess sample runs
is