Hardware preparation and installation, 1 unpacking and inspecting the blade, 2 environmental and power requirements – Artesyn ATCA-7480 Installation and Use (February 2015) User Manual
Page 43: Chapter 2
Chapter 2
ATCA-7480 Installation and Use (6806800T17A)
43
Hardware Preparation and Installation
2.1
Unpacking and Inspecting the Blade
Shipment Inspection
To inspect the shipment, perform the following steps.
1. Verify that you have received all items of your shipment:
ATCA-7480 blade
Any optional items ordered
2. Check for damage and report any damage or differences to the customer service.
3. Remove the desiccant bag shipped together with the blade and dispose of it
according to your country’s legislation.
2.2
Environmental and Power Requirements
In order to meet the environmental requirements, the blade has to be tested in the system in
which it is to be installed.
Damage of Circuits
Electrostatic discharge and incorrect blade installation and removal can damage circuits or
shorten their life.
Before touching the blade or electronic components, make sure that you are working in an
ESD-safe environment.
The blade is thoroughly inspected before shipment. If any damage has occurred during
transportation or any items are missing, contact our customer's service immediately.