beautypg.com

Yield monitor 2000, Ag leader technology – Ag Leader Yield Monitor 2000 Operators Manual User Manual

Page 125

background image

Yield Monitor 2000

Printing Field/Load Summary

Ag Leader Technology

June 1997

4-59

Step

Action

1

Click on File.

2

Click on Properties.

3

Click on Configure, then ensure the parameters are correct.

If the parameters are correct, follow these steps to select a different

COM port.

Step

Action

1

Click on File.

2

Click on Properties.

3

Change to a different COM port.

4

Click on Configure to set the parameters for the new COM port
according to Step 8 in the HyperTerminal Setup (Windows 95)
section above.

If communications are not established, check the cable connection to see

whether it is connected to something other than a COM port.

If communications still are not established, follow these steps:

Step

Action

1

Turn off the yield monitor, then turn it back on.

2

Press the MEM key.

3

Set the monitor to “READY TO PRINT”.

4

Press Enter (Return key) on the PC keyboard and look for the
message “Type PRINT, NAME or START & press Enter”

If you are unable to establish communications, call Ag Leader

Technology at 515-232-5363 for assistance.