Fig. 8.36, Ring protection, Fig. 8.37 – Siemens S223 User Manual
Page 266: Link failure recovery
UMN:CLI User Manual
SURPASS hiD 6615 S223/S323 R1.5
266 A50010-Y3-C150-2-7619
Normal Node
Normal Node
Normal Node
RM Node
P
S
1. Secondary port of RM node is
changed as unblocking state
2. Send Link
Down Message
2. Send Link
Down Message
Fig. 8.36
Ring Protection
When a Link Failure is recovered, a temporary loop may occur. To rectify this condition,
ERP sends a “link up” message to the RM. The RM will logically block the protected
VLANs on its secondary port and generate a “RM link up” packet to make sure that all
transit nodes are properly reconfigured. This completes fault restoration and the ring is
back in normal state.
2. Nodes detecting Link Failure
send Link Down message
2. Nodes detecting Link Failure
send Link Down message
Normal Node
Normal Node
1. Link Failure recover
blocks the port
recovered from Link
Failure
Normal Node
RM Node
P
S
Fig. 8.37
Link Failure Recovery