beautypg.com

Procedure – Adept AdeptSight User Guide User Manual

Page 66

background image

Procedure

Requirements

l

The robot and belt must be correctly connected and functioning.

l

The AdeptSight Belt Calibration Interview Wizard must have completed successfully.

What this Wizard Does

This calibration is necessary when the robot will handle parts that are moving on a conveyor
belt.

With this wizard you will:

l

Establish the relationship between the belt, its encoder, and the robot

l

Specify the upstream and downstream limits on the belt

l

Specify the downstream pick limit on the belt

l

Establish the usable width of the belt

Procedure

All screens have the title "Robot-to-Belt Calibration Sequence".

The screens in this procedure are:

l

Select End-effector

l

Test Encoder Operation

This lets you confirm that the belt encoder is communicating with the controller.

AdeptSight User's Guide, Version 3.2.x, Updated: 8/23/2012

Page 66