beautypg.com

7 initial power on verification, Wer-on verification (see – INFICON XTC/3 Thin Film Deposition Controller Operating Manual User Manual

Page 32

background image

1 - 16

PN

07

4-

44

6-

P1

J

XTC/3 Operating Manual

1.7 Initial Power On Verification

A preliminary functional check of XTC/3 can be made before formal installation. It
is not necessary to have sensors, source controls, inputs or relays connected to do
this. For more complete installation information, refer to

Chapter 2, Installation and

Interfaces

.

WARNING - Risk Of Electric Shock

There are no user-serviceable components
within the XTC/3 case.

Dangerous voltages may be present whenever the power
cord or external input/relay connectors are present.

Refer all maintenance to qualified personnel.

WARNING - Risk Of Electric Shock

Never interrupt the protective earth circuit.

Any interruption of the protective earth circuit inside or
outside XTC/3, or disconnection of the protective earth
terminal is likely to make XTC/3 dangerous.

This symbol indicates where the protective earth ground
is connected inside XTC/3. Never unscrew or loosen this
connection.

1

Confirm that AC line voltage is supplied and proper for XTC/3. Set the power
switch on XTC/3 rear panel to On.

2

Press the power button on the front panel. A green LED will illuminate next to
the power switch.