Powering up the routing switcher – Grass Valley Trinix NXT v.3.3.1 User Manual

Page 133

background image

Trinix NXT — Installation and Service Manual

133

Summary of Installation Procedure

Note

All alarms are now reported as primary alarms. For example, a single fan
failure, which would be a secondary alarm in the past, will now be reported
as a primary alarm.

Powering Up the Routing Switcher

Connect the AC power cords to power up the system.

If the LED on the front panel turns to green after the first few seconds
of operation, the system is operating properly.

If the LED continues to glow red, power down the system and diagnose
the problem before powering up the system again. For an explanation
of LED alarm lights, see Troubleshooting

on page 393

.

CAUTION For TRX-NXT-512x512 Routing switchers: In order to avoid damage, the

power MUST be turned Off before removing/installing the “IFC” cables.

Keep the front door closed as much as possible when the system is running
to maximize the airflow and cooling system. Leave a 2 RU space beneath
the 512x1024 routing switcher to ensure proper air flow.

Note

The front door should be closed during normal operation. Although the Trinix
Routing switcher will function properly with the door open, leaving the frame
open on a continuous basis will result in shortened product life.