Hardware installation, Summary of installation procedure, Pre-installation steps – Grass Valley Trinix NXT v.3.3.1 User Manual
Page 125: Section 3 — hardware installation

Installation and Service Manual125
Section
3
Hardware Installation
Summary of Installation Procedure
The following list is a summary of the steps that are needed for the
installation of the Trinix Routing Switcher System.
1.
Pre-installation steps
2.
Rack requirements
3.
Connecting the Power supplies
4.
Connecting and Configuring the Reference signals
5.
Connecting the cables
6.
Control and Monitoring Systems
7.
Optional steps
8.
Power up the Routing switcher
Additional details may be found elsewhere in this manual as indicated.
Pre-Installation Steps
Prior to starting the Installation process and unpacking the equipment,
inspect the shipping carton for evidence of freight damage.
After unpacking, carefully inspect all equipment for freight damage. If
there has been damage to the contents:
•
Notify the carrier and Grass Valley of the damage.
•
Retain all shipping cartons and padding material for inspection by
the carrier.
•
Do NOT return damaged merchandise to Grass Valley until an
appropriate claim has been filed with the carrier and a material
return authorization number has been received from Grass Valley.