System configuration one-line diagram – Basler Electric DGC-2020HD User Manual
Page 56
46
9469300990 Rev B
•
Multigen Management
o
AVR Output
o
GOV Output
o
LS (Load Share) Output
o
Demand Start/Stop
o
Sequencing
o
Network Configuration
•
Programmable Inputs
o
Contact Inputs
o
Analog Inputs
o
Remote Contact Inputs
o
Remote Analog Inputs
o
Remote RTD Inputs
o
Remote Thermocouple Inputs
o
Programmable Functions
•
Programmable Outputs
o
Configurable Elements
o
Remote Analog Outputs
•
Logic
o
Logic Timers (1-8)
o
Logic Timers (9-16)
o
Logic Counters
Summary
•
System Configuration One-Line Diagram
•
Mains Fail St (Status)
o
Mains Fail St (Status)
o
Transfer Delay
o
Return Delay
o
Max Transfer Time
o
Max Parallel Time
o
Open Transition Delay
•
Gen VLL
•
Gen Hz
•
Gen Aac
•
kW
•
kvar
•
PF (Power Factor)
•
PF Lead/Lag
•
Bus1 VLL
•
Bus1 Hz
•
Bus2 VLL (optional)
•
Bus2 Hz (optional)
•
GB Command
o
Open, Close, or None
•
MB Command
o
Open, Close, or None
System Configuration One-Line Diagram
A one-line diagram of the system breaker configuration is displayed on the front panel. This diagram
changes in real time to reflect the current state of the breakers.
The one-line diagram appears on both the front panel Overview and Summary screens. The Summary
screen provides metering for generator and bus parameters as well as breaker controls. The one-line
diagram is displayed at the top, generator and bus parameters are displayed below that, and breaker
Controls and Indicators
DGC-2020HD