Basler Electric DGC-2020HD User Manual
Page 260

250
9469300990 Rev B
ECU Related Time Values - Settling Time
This parameter is the duration of the “on line” time of the pulse cycle during which the DGC-2020HD
reads data from the ECU. The settling time should be set long enough so that any ECU parameters that
require time to “settle down” after the ECU is on line can do so. Since the DGC-2020HD may use some of
the ECU data for alarm or pre-alarm annunciation, it is important that the data have time to settle.
CAN Bus 1 Address
This parameter sets a unique address number for the DGC-2020HD operating on CAN 1 (Remote
Modules).
Baud Rate
This setting dictates the rate at which the DGC-2020HD communicates with CAN 1. The selected baud
rate must match the baud rate of the other nodes on the CAN. Both CEM-2020 and AEM-2020 baud rates
are 250 kbps.
Figure 157. Settings Explorer, Communications, CAN Bus, CAN Bus Setup
Table 71. Settings for CAN Bus Setup
Locator
Setting
Range
Increment
Unit
A
SPN Conversion Method
1 to 4
1
n/a
B
CAN Bus 2 Address
1 to 253
1
n/a
C
Generator Parameter Transmit
Enable or Disable
n/a
n/a
D
Engine Control Parameter
Transmit
Enable or Disable
n/a
n/a
E
Engine Shutdown
1 to 60
1
seconds
F
Pulse Cycle Time
1 to 60
1
minutes
G
Settling Time
5,500 to 30,000
1
milliseconds
H
Response Timeout
1 to 60
1
seconds
Communication
DGC-2020HD