beautypg.com

8 universal pecking (cycle 205, din/iso: g205), Cycle run – HEIDENHAIN iTNC 530 (34049x-08) Cycle programming User Manual

Page 95

background image

HEIDENHAIN iTNC 530

95

3.8

UNIVER

SAL

PECKING

(Cy

cle

205,

DIN/ISO:

G205)

3.8 UNIVERSAL PECKING

(Cycle 205, DIN/ISO: G205)

Cycle run

1

The TNC positions the tool in the tool axis at rapid traverse FMAX to

the programmed set-up clearance above the workpiece surface.

2

If you enter a deepened starting point, the TNC moves at the

defined positioning feed rate to the set-up clearance above the

deepened starting point.

3

The tool drills to the first plunging depth at the programmed feed

rate F.

4

If you have programmed chip breaking, the tool then retracts by

the entered retraction value. If you are working without chip

breaking, the tool is moved at rapid traverse to the set-up

clearance, and then at FMAX to the entered starting position above

the first plunging depth.

5

The tool then advances with another infeed at the programmed

feed rate. If programmed, the plunging depth is decreased after

each infeed by the decrement.

6

The TNC repeats this process (2 to 4) until the programmed total

hole depth is reached.

7

The tool remains at the hole bottom—if programmed—for the

entered dwell time to cut free, and then retracts to the set-up

clearance at the retraction feed rate. If programmed, the tool

moves to the 2nd set-up clearance at FMAX.

This manual is related to the following products: