Cycle run – HEIDENHAIN iTNC 530 (34049x-08) Cycle programming User Manual
Page 113

HEIDENHAIN iTNC 530
113
4.3
RIGID
TA
PPING
without
a
Floating
Ta
p
Holder
NEW
(Cy
cle
207
,D
IN/ISO:
G207)
4.3 RIGID TAPPING without a
Floating Tap Holder NEW
(Cycle 207, DIN/ISO: G207)
Cycle run
The TNC cuts the thread without a floating tap holder in one or more
passes.
1
The TNC positions the tool in the tool axis at rapid traverse FMAX to
the programmed set-up clearance above the workpiece surface.
2
The tool drills to the total hole depth in one movement.
3
Once the tool has reached the total hole depth, the direction of
spindle rotation is reversed and the tool is retracted to the set-up
clearance at the end of the dwell time. If programmed, the tool
moves to the 2nd set-up clearance at FMAX.
4
The TNC brings spindle rotation to a stop at the set-up clearance.