beautypg.com

Cycle run – HEIDENHAIN iTNC 530 (34049x-08) Cycle programming User Manual

Page 132

background image

132

Fixed cycles: tapping / thread milling

4.9

HELICAL

THREAD

DRILLING/MI

LLING (Cy

cle 265, DIN/ISO:

G265)

4.9 HELICAL THREAD

DRILLING/MILLING (Cycle 265,

DIN/ISO: G265)

Cycle run

1

The TNC positions the tool in the tool axis at rapid traverse FMAX to

the programmed set-up clearance above the workpiece surface.

Countersinking at front

2

If countersinking is before thread milling, the tool moves at the

feed rate for countersinking to the sinking depth at front. If

countersinking occurs after thread milling, the TNC moves the tool

to the countersinking depth at the feed rate for pre-positioning.

3

The TNC positions the tool without compensation from the center

on a semicircle to the offset at front, and then follows a circular

path at the feed rate for countersinking.

4

The tool then moves in a semicircle to the hole center.

Thread milling

5

The TNC moves the tool at the programmed feed rate for pre-

positioning to the starting plane for the thread.

6

The tool then approaches the thread diameter tangentially in a

helical movement.

7

The tool moves on a continuous helical downward path until it

reaches the thread depth.

8

After this, the tool departs the contour tangentially and returns to

the starting point in the working plane.

9

At the end of the cycle, the TNC retracts the tool at rapid traverse

to set-up clearance, or—if programmed—to the 2nd set-up

clearance.

This manual is related to the following products: