3 drilling cycles, 3 dr illing cy cles – HEIDENHAIN TNC 426B (280 472) ISO programming User Manual
Page 162

8 Programming: Cycles
146
8.3 Drilling Cycles
The TNC offers 9 (or 13) cycles for all types of drilling operations:
Cycle
Soft key
G83 PECKING
Without automatic pre-positioning
G200 DRILLING
With automatic pre-positioning,
2nd set-up clearance
G201 REAMING
With automatic pre-positioning,
2nd set-up clearance
G202 BORING
With automatic pre-positioning,
2nd set-up clearance
G203 UNIVERSAL DRILLING
With automatic pre-positioning,
2nd setup clearance, chip breaking, and decrement
G204 BACK BORING
With automatic pre-positioning,
2nd set-up clearance
G205 UNIVERSAL PECKING
(only with TNC 426 and TNC 430 with NC software 280 474-xx)
With automatic pre-positioning,
2nd setup clearance, chip breaking, advanced
stop distance
8.3 Dr
illing Cy
cles
Cycle
Soft key
G84 TAPPING
With a floating tap holder
G85 RIGID TAPPING
Without a floating tap holder
G86 THREAD CUTTING
(not in TNC 410)
G206 TAPPING NEW
(only with TNC 426, TNC 430 with NC software
280 474-xx)
with floating tap holder
automatic pre-positioning,
2nd setup clearance
G207 RIGID TAPPING NEW
(only with the TNC 426, TNC 430 with NC
software 280 474-xx)
Without floating tap holder, with
automatic pre-positioning,
2nd setup clearance
G208 BORE MILLING
(only with the TNC 426, TNC 430 with NC
software 280 474-xx)
With automatic pre-positioning,
2nd set-up clearance
Kkap8.pm6
29.06.2006, 08:06
146