beautypg.com

H3C Technologies H3C S9500 Series Switches User Manual

Page 99

background image

Installation Manual
H3C S9500 Series Routing Switches

Chapter 4 Switch Installation

4-30

le cannot be less than 5 times of its diameter at the

place where it is led out of the connector;

rd, signal cable, PGND wire, etc.) should be cabled and

× 3.6 mm (11.8 × 0.1 in), 530 × 9 mm (20.9 ×

m (22.8

× 0.5 in);

e ties neatly after bundling the cables, leaving no sharp or

. See the following figure:

z

The bending radius of cable body cannot be less than twice of the cable diameter.

The bending radius of the cab

z

Different cables (power co

bundled separately rather than together in the cabinet. If they are close to each

other, you can cable them in cross-shape. For parallel cabling, the space between

power cord and signal cable should be no less than 30 mm (1.2 in);

z

The cable binding rack and cabling channel inside and outside the cabinet should

be smooth and without sharp edges or tips;

z

The metal cable management hole should have a smooth and fully rounded

surface or wear a insulating bush;

z

Use the right type of ties to bundle the cables. Do not bundle cables with joined

ties. The following types of ties are available currently: 100

× 2.5 mm (3.9 in × 0.1

in), 150

× 3.6 mm (5.9 × 0.1 in), 300

0.4 in), and 580

× 13 m

z

Cut the extra parts of th

angular tips

Figure 4-32 Cable bundling example II

z

Bundle the cables wherever cable bending cannot be avoided. Ho

ties cannot be placed inside the bending area in case of the likel

core break due to excessive stress. See the following figure.

wever, the cable

ihood of cable