Ii. installing slide rail – H3C Technologies H3C S9500 Series Switches User Manual
Page 173

Installation Manual
H3C S9500 Series Routing Switches
Appendix B Installation of B68 Cabinet
B-22
(1) Bolt M12X60
(2) Spring washer Φ12
(3) Big flat washer Φ12
(4) Expansion tube
(5) Expansion nut
(6) Height-retaining bolt (both sides)
(7) Height-retaining bolt (middle)
(8) Height scale
Figure B-23
Connection between the support and ground
Caution:
As shown in Figure B-23, fasten the middle height-retaining bolt first, and then the side
ones.
II. Installing slide rail
1) Installing T nuts
Before the slide rail is installed, put the T nuts into the lower trough of the slide rails. The
T nuts are used to fix the slide rails and the angle plate for floor bracket. Each cabinet
needs eight T nuts, four in each of the slide rail (two of them are used for floor bracket
assemblies). Otherwise, after the slide rail is installed, the T nuts cannot be installed.
The appearance of T-type nut is shown in Figure B-24. There are four sets of angle
plates (for floor bracket fixing) for each cabinet, two on each of the slide rail.
- H3C S7500E Series Switches H3C S7500 Series Switches H3C S5800 Series Switches H3C S5820X Series Switches H3C S5500 Series Switches H3C S5120 Series Switches H3C S3610[S5510] Series Switches H3C S3600 Series Switches H3C S3100 Series Switches OAA For Routers H3C WX6000 Series Access Controllers H3C WX5000 Series Access Controllers H3C WX3000 Series Unified Switches H3C LSQM1WCMB0 Access Controller Module H3C LSBM1WCM2A0 Access Controller Module H3C WA2600 Series WLAN Access Points H3C WA2200 Series WLAN Access Points H3C SecPath F1000-E H3C SecPath F1000-A H3C SecPath F1000-S H3C SecPath F100-A H3C SecPath F100-C-EI H3C SecPath V100-E H3C SecCenter iTAS H3C Device Manager