H3C Technologies H3C S9500 Series Switches User Manual
Page 83
Installation Manual
H3C S9500 Series Routing Switches
Chapter 4 Switch Installation
4-14
S
ounting nuts of the co
ectors on the DC PSU using the socket
Step 2: Insert the -48V terminal (with a blue wire) of the DC power cord of the switch
sert the other end
sert one end of the GND OT terminal (with a black wire) of the DC power cord
) of the DC
tep 1: Loosen the m
nn
wrench.
into the “-48V” connector on the PSU and fasten the mounting nut. In
of the OT terminal into the “-48V” connector on the external power supply.
Step 3: In
into the “RTN” connector on the PSU, and fasten the mounting nut. Connect the other
end of the OT terminal to the RTN connector on the external power supply.
Step 4: Insert one end of the PGND OT terminal (with a yellow-green wire
power cord into the “PGND” connector on the PSU, and fasten the mounting nut.
Connect the other end of the OT terminal to the ground bar for the switch.
(1) Input LED
(2) Output LED
(4) PGND
(5) RTN
Figure 4-14 Connect DC power cord for the S9505
(3) Fail LED
(6) -48V
(1)
(2)
(3)
(7)
(4)
(5)
(6)
(1)
(2)
(3)
(7)
il LED
N
(4)
(5)
(6)
(1) Input LED
(2) Output LED
(3) Fa
(4) Power switch
(5) PGND
(6) RT
(7) -48V
Figure 4-15 Connect DC power cord for the S9508/S9512
- H3C S7500E Series Switches H3C S7500 Series Switches H3C S5800 Series Switches H3C S5820X Series Switches H3C S5500 Series Switches H3C S5120 Series Switches H3C S3610[S5510] Series Switches H3C S3600 Series Switches H3C S3100 Series Switches OAA For Routers H3C WX6000 Series Access Controllers H3C WX5000 Series Access Controllers H3C WX3000 Series Unified Switches H3C LSQM1WCMB0 Access Controller Module H3C LSBM1WCM2A0 Access Controller Module H3C WA2600 Series WLAN Access Points H3C WA2200 Series WLAN Access Points H3C SecPath F1000-E H3C SecPath F1000-A H3C SecPath F1000-S H3C SecPath F100-A H3C SecPath F100-C-EI H3C SecPath V100-E H3C SecCenter iTAS H3C Device Manager