beautypg.com

H3C Technologies H3C S9500 Series Switches User Manual

Page 83

background image

Installation Manual
H3C S9500 Series Routing Switches

Chapter 4 Switch Installation

4-14

S

ounting nuts of the co

ectors on the DC PSU using the socket

Step 2: Insert the -48V terminal (with a blue wire) of the DC power cord of the switch

sert the other end

sert one end of the GND OT terminal (with a black wire) of the DC power cord

) of the DC

tep 1: Loosen the m

nn

wrench.

into the “-48V” connector on the PSU and fasten the mounting nut. In

of the OT terminal into the “-48V” connector on the external power supply.

Step 3: In

into the “RTN” connector on the PSU, and fasten the mounting nut. Connect the other

end of the OT terminal to the RTN connector on the external power supply.

Step 4: Insert one end of the PGND OT terminal (with a yellow-green wire

power cord into the “PGND” connector on the PSU, and fasten the mounting nut.

Connect the other end of the OT terminal to the ground bar for the switch.

(1) Input LED

(2) Output LED

(4) PGND

(5) RTN

Figure 4-14 Connect DC power cord for the S9505

(3) Fail LED
(6) -48V

(1)
(2)

(3)

(7)

(4)

(5)

(6)

(1)
(2)

(3)

(7)

il LED

N

(4)

(5)

(6)

(1) Input LED

(2) Output LED

(3) Fa

(4) Power switch

(5) PGND

(6) RT

(7) -48V

Figure 4-15 Connect DC power cord for the S9508/S9512