Installation Manual
H3C S9500 Series Routing Switches
Chapter 5 System Debugging
5-4
Test
Test
Figure 5-6 Set the terminal emulation parameters
5.2 Powering and Booting the Switch
5.2.1 Verifying Installation before Powering the Switch
You should verify the installation of the switch before powering it on, to make sure that
z
The switch is stable enough.
z
All the boards have been correctly installed.
z
All the communication cables, fibers, power cords, and grounding wires have been
correctly connected.
z
The proper power voltage is used as required by the switch.
z
The Console cable has been correctly connected, the PC or terminal for
configuration has been in service and all the required terminal parameters have
been set.
Caution:
Before powering on the switch, locate the position of the power switch for the
equipment room where you will operate so that you can switch off the power supply
promptly in case of any accident.
5.2.2 Powering on the Switch
z
Turn on the power switch of the power source providing power to the switch.
z
Turn on the power switch of the PWR on the switch.
- H3C S7500E Series Switches H3C S7500 Series Switches H3C S5800 Series Switches H3C S5820X Series Switches H3C S5500 Series Switches H3C S5120 Series Switches H3C S3610[S5510] Series Switches H3C S3600 Series Switches H3C S3100 Series Switches OAA For Routers H3C WX6000 Series Access Controllers H3C WX5000 Series Access Controllers H3C WX3000 Series Unified Switches H3C LSQM1WCMB0 Access Controller Module H3C LSBM1WCM2A0 Access Controller Module H3C WA2600 Series WLAN Access Points H3C WA2200 Series WLAN Access Points H3C SecPath F1000-E H3C SecPath F1000-A H3C SecPath F1000-S H3C SecPath F100-A H3C SecPath F100-C-EI H3C SecPath V100-E H3C SecCenter iTAS H3C Device Manager