Plc communication problems, Troubleshooting appendix b – Rockwell Automation 2711 PANELBUILDER SOFTWARE USER MANUAL User Manual
Page 411

Troubleshooting
Appendix B
B-6
Consult Table B.E to identify PLC communication problems.
Table B.E
PLC Communication Problems
Problem
Cause
What to do
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
PLC Communication Lost" message on
PanelView terminal.
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
PLC controller is in Program or Remote Program
mode.
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
Change PLC controller to Run mode.
Cable problem.
Check termination and cable pinout.
ББББББББББББ
ББББББББББББ
ББББББББББББ
ББББББББББББ
Incorrectly defined terminal as Last Chassis.
ББББББББББББ
ББББББББББББ
Set Last Chassis to No for that rack assignment.
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
Rack assignments in PanelView and PLC do not
match.
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
Make sure rack assignments in PLC controller
match those in PanelView.
ББББББББББББ
Б
ББББББББББ
Б
Б
ББББББББББ
Б
ББББББББББББ
ББББББББББББ
Б
ББББББББББ
Б
Б
ББББББББББ
Б
ББББББББББББ
Terminating resistor not installed properly.
ББББББББББББ
Б
ББББББББББ
Б
Б
ББББББББББ
Б
ББББББББББББ
The terminating resistor must be installed at the
PLC and at the end of the link:
150W 1/2 watt resistor for 57.6 or 115.2 kbaud
82W 1/2 watt resistor for 230 kbaud
PanelView terminal and Scanners Remote I/O
baud rate do not match.
Change the Remote I/O baud rate in PanelView
terminal or the scanner so they match.
PLC Communication Lost" message when
using PanelView terminal with PLCĆ5.
PanelView terminal has been assigned to
multiple or partial racks when firmware revision
of PLCĆ5 does not support partial rack
addressing.
Configure PanelView terminal as a single full
rack.
Upgrade PLCĆ5/15 to Series B Revision H.
Upgrade PLCĆ5/25 to Series A Revision D.
PLC controller is not configured to recognize the
PanelView terminal's rack assignments.
Refer to your PLCĆ5 User's Manual regarding
Auto Configuration.
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
Periodic PLC Communication Lost" when
using 1772ĆSD2 scanner with PLCĆ2s.
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
Must use 1772ĆSD2 scanner Rev. 3 or later.
ББББББББББББ
Б
ББББББББББ
Б
Rapid blinking of PLC Communication Lost"
when using 1775ĆS4A scanner with a PLCĆ3.
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
Б
ББББББББББ
Б
Must use 1775ĆS4A scanner series B or later.
PLC Communication Lost" when using SLC
500 1747ĆSN Scanner Module.
The 1747ĆSN Scanner Module is not properly
configured.
Refer to 1747ĆRIO Scanner User's Manual
regarding Specialty I/O Configuration and how to
configure Mfiles and Gfiles.
Verify that the PanelView terminal and the
1747ĆSN Scanner Module Remote I/O baud
rates are set the same.
ББББББББББББ
Б
ББББББББББ
Б
Б
ББББББББББ
Б
ББББББББББББ
Discrete I/O works but block transfer does
not. No PLC Communication Lost"
message. Using PLCĆ5/15, partial rack
addressing.
ББББББББББББ
Б
ББББББББББ
Б
Б
ББББББББББ
Б
ББББББББББББ
ББББББББББББ
Б
ББББББББББ
Б
Б
ББББББББББ
Б
ББББББББББББ
Must use PLCĆ5/15 series B Rev. J or later.
Discrete I/O works but block transfer does
not. No PLC Communication Lost"
message.
Block transfer assignments in PanelView do not
match block transfer instructions in PLC.
Make sure PLC block transfer instruction
parameters match PanelView parameters.
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
PLC Controller rack fault on rack assigned to
PanelView.
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
Specified No for Last Chassis when the
PanelView is the last chassis in that rack.
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
Set Last chassis to Yes for that rack assignment.
ББББББББББББ
ББББББББББББ
PLC Communication Lost" message and
rack fault on rack assigned to PanelView.
ББББББББББББ
ББББББББББББ
MisĆmatched baud rate on PanelView and PLC
controller.
ББББББББББББ
ББББББББББББ
Specify same baud rate for PanelView and PLC
controller.
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
Multiple devices configured for the same rack
assignment.
ББББББББББББ
Б
ББББББББББ
Б
ББББББББББББ
Multiple remote I/O devices must have unique
rack assignments.
PLC Communication Problems