Installing the engineering terminal, Nsystem configuration, Lsoftware conditions – Yokogawa GC8000 Process Gas Chromatograph User Manual
Page 10: Lhardware conditions

1
IM 11B06C01-01E
Installing the Engineering Terminal
This chapter describes the installation of the Engineering Terminal (ASET) in the personal
computer system being used. Please read the chapter 8, when you use the PCAS for ARC-
NET (/ARC).
This installation assumes that your PC system is already in the ready state under the fol-
lowing conditions and also that you have some knowledge of how to use the system.
n
System Configuration
l
Software conditions
ASET
Model Name
Basic Code Option Code
Specification
ASET
•••••••••••••••••••• ••••••••••••••••• Software Package
Function
-A01
-S01
•••••••••••••••••
•••••••••••••••••
Standard
Signal analyzer mode
Language
E
J
•••••••••••••••••
•••••••••••••••••
English
Japanese
—
-N
••••••••••••••••• Always -N
—
N ••••••••••••••••• Always N
Additional
/ARC
ARCNET supported version
(Intended for GC1000 Mark II)
l
Hardware conditions
Before installing ASET, check that the hardware meets the following conditions:
• OS: Microsoft Windows 7 SP1 / Windows XP Professional SP3 / Windows Server 2008 SP2
32-bit version only for any of the above OSs
English or Japanese
• CPU: 32-bit - 1 GHz or higher
• Memory: 1 GB or more
• Hard disk: At least 20MB (for the program section only)
• Display: SVGA (1024 x 768)
• Ethernet port: 1 (100BaseTX or 100BaseFX)
• Others: CD-ROM drive
• For the hard disk, a data storage capacity should be secured separately according to your
PC system format, in addition to the capacity for the program.
• Communications function: Analyzers and analyzer server(s) must be connected via
Ethernet communication. The analyzer server and your PC must also be connected via
Ethernet communication.
5th Edition : Nov. 16, 2011-00