Csu line build out, Csu line build out -26, Igure – Verilink XEL XSP-100 SHARK IAP (9SA-USRS-9.0R1.02) Product Manual User Manual
Page 80: Wan t1

Chapter 5: Graphical User Interface (GUI/WEB) Configuration Pages
Chapter 5-26
XEL P/N & Release: 9SA-USRS-9.0R1.02
SHARK™ IAD User's Guide
secondary WAN. Select the closest distance from the SHARK™ IAD to the
CSU or CPE attached to this module. See the Line Build Out section of the
WAN configuration page that is shown in Figure 21 for the possible selections.
CSU Line Build
Out
CSU build out is used to balance the 4-Wire T1 line going back to the Central
Office. Select the pad value needed to properly coordinate the transmit and
receive levels from the SHARK™ IAD at the NID or smart jack. Too hot of a
transmit signal level from the SHARK™ IAD at the receive in of the NID can
cause cross talking of the signals.
When you are satisfied with your WAN configuration choices, click on the save
button. This will save and load the new T1 configuration. The system will
return to the home page.
You have completed configuring the Transport functions of your SHARK™
IAD. Proceed to configure the Data transport selecting the config button of the
Router module.
Figure 21:
WAN T1 configuration page
WAN-1 Configuration
Alarm Reporting:
Disable
Enable
SF
ESF
SLC-96
Framing
Line Coding
AMI
B8ZS
Remote Loopback Option
In Band
ESF/FDL
DSX
Line Build Out
0-133 ft
133-266 ft
266-399 ft
399-533 ft 533-655 ft
-15 dB
-7.5 dB
-22.5 dB
Disable
Enable
Disable
Enable
CSU
CSU
CSU
CSU
DSX
DSX
DSX
DSX
0 dB