Chapter 2: Installation

Chapter 2-6

XEL P/N & Release: 9SA-USRS-9.0R1.02

SHARK™ IAD User's Guide

R

ACK

M

OUNTING

The SHARK™
IAD Universal
Mounting Bracket

Figure 3 shows the SHARK™ IAD mounted in a rack. The supplied mounting
brackets enable the unit to be mounted in a 19” or 23” rack. When mounting
multiple units in this configuration suitable spacing must be maintained for proper
convection airflow. The total vertical area for the unit must be at least a 3U
(5.25”) spacing to provide proper airflow. Route the Voice module cabling along
the left side and secure the cables to the rack to provide stress relief on the voice
connectors. Route all other cabling along the right side. This will allow
maximum access to the front of the unit.
The SHARK™ IAD universal mounting bracket is used to secure the unit either to
the rack rails in the case of rack mounting or to the wall when a unit is wall
mounted. This bracket can be installed in any of three positions depending on the
mounting configuration. Installation for 19” and 23” rack configurations are
covered here. See page 2-7 of this chapter for its use in wall mounting
configurations.
The detail of Figure 3 shows a partial side and front view of a rack mounted unit.
Configuration one of this view shows the bracket installed for a 19“ rack. The
longer side of the bracket is placed flat against the unit. The two oval holes on the
short side are used to mount the entire assembly to the 19” rack rails.
Configuration two shows the bracket installed for a 23” rack. In this case, the
short side of the bracket is mounted against the side of the unit. The oval holes on