Electrical related items checklist – Gasboy Atlas Start-up User Manual
Page 31

MDE-4334D Atlas™ Start-up and Service Manual · July 2013
Page 3-3
Start-up Checklists
Start-up Procedures
Electrical Related Items Checklist
Item
Procedure
Refer To
Checked
1
Equipment must be installed in conjunction with an
emergency power cut-off to shut off all power from the
equipment in case of an emergency.
• MDE-4333 Atlas Fuel Systems Site Prep Manual
• FE-356 Atlas Pump and Dispenser Field Wiring
• FE-357 Atlas Pump Retail/Commercial Field Wiring
2
STP isolation relays are required for all dispensers.
3
Retail 8800 only: Use twisted-pair wires as specified for
two-wire communication for new installations or where
new wire is pulled. Do not use a shielded wire.
4
All wiring must be stranded copper of the gauge and
insulation casing specified.
5
All grounds must be properly connected as per the
installation manual requirements as well as state, local,
and national codes.
MDE-4331 Atlas Fuel Systems Installation Manual
6
Conduit must be approved for hazardous locations and
properly sized for the wiring involved.
• NFPA 30A
• NFPA 70
®
• UL 87
• NEC
®
7
Properly size all circuit breakers for the units/unit options
involved.
NEC and local codes
8
All pump/dispenser wiring must be properly spaced and
isolated from wiring for electrically noisy devices such as
variable speed STPs, station equipment motors, and other
devices.
MDE-4333 Atlas Fuel Systems Site Prep Manual
9
All power wiring and circuit breakers to Gasboy Atlas
equipment must be dedicated and not be shared with
other equipment.
10
At temperatures below 15 °F (-9.44 °C) for DEF units filled
with fluid, power must be supplied to the DEF heater as
well as for external plumbing.
11
All circuit breakers to Gasboy Atlas equipment must be
clearly labeled and readily accessible.
12
All Distribution Boxes (D-Boxes) must be clearly labeled
showing the pump/dispenser number connections.
13
All pumps/dispensers must be wired to the same phase of
electrical power.
14
New site wiring must be Megger
®
tested. Old site wiring
must be continuity and short-tested with a digital meter.
15
Wiring color must be coded or tagged, sized for distance
and application, and resistant to gas and oil.
16
Remove all tie-wraps securing pulsers and ensure that the
pulser is able to float (pumps).
17
Confirm proper wiring, if used with a Gasboy FMS (using
the appropriate FMS installation manual).
• MDE-4811 Islander PLUS and ICR PLUS Installation
Manual
• MDE-4298 CFN Series Site Controller III Installation
Manual
• MDE-4319 TopKAT Fuel Management System
Installation Manual
• MDE-4813 CFN Plus Installation Manual
• For Atlas units with the D5 TopKAT PLUS option, refer to
MDE-5013 TopKAT PLUS Installation Manual.