Gasboy Atlas Fuel Systems Site Prep Manual User Manual
Site preparation manual
Table of contents
Document Outline
- Atlas™ Fuel Systems Site Preparation ManualMDE-4333E
- Table of Contents
- 1 - Introduction
- 2 - Important Safety Information
- 3 - Site Preparation
- Station Layout
- Station Security
- Equipment and Materials Required at Site
- Electrical Requirements
- Emergency Power Cutoff Switch
- Units with Ground Fault Interrupt (GFI)
- Circuit Breakers
- STP Control Relay Boxes for Dispensers
- STP Isolation Relays for Electronic Dispensers
- Conduit
- Wiring
- Retail Data Wire Lengths
- Commercial Data Wire Lengths
- Grounding
- Electrical Control Lines
- Wiring Overview
- Pump Motors
- Heater Load Table
- Sealing ‘Y’ Fittings
- Plumbing Requirements
- Connecting the Pump/Dispenser Inlet Pipes
- Important Considerations for DEF Dispensers
- Important Considerations when Changing Fuel Types
- DEF Plumbing
- Fuel Tanks
- Leak Detectors
- STPs
- Pipe Installation
- Check Valves
- Shear Valves
- Model 9850KXTW1 Shear Value Configuration
- OPW Shear Valve for 9862KXTW1 DEF Unit
- Pit Box Mounting
- Safety Signs
- Connecting the Vapor Return Line to the Vapor Shear Valve
- Index