beautypg.com

Preface – Allied Telesis AT-9000 Series User Manual

Page 11

background image

11

Preface

This is the web browser management guide for the AT-9000/12POE,
AT-9000/28, AT-9000/28POE, AT-9000/28SP, and AT-9000/52 Managed
Layer 2-4 Gigabit Ethernet EcoSwitches. The instructions in this guide
explain how to start a management session, use the web interface of the
AlliedWare Plus™ Management Software, and configure the features of
the switch.

For hardware installation instructions, refer to the AT-9000 Manager Layer
2 GB EcoSwitch Series Installation Guide
.

This preface contains the following sections:

“Document Conventions” on page 12

“Downloading Management Software and Web-based Guides” on
page 13

“Contacting Allied Telesis” on page 14

Caution

The customer, re-seller, sub-contractor, distributor, software
developer or any buyer of an Allied Telesis “ATI” product known as
“customer”, hereby agrees to have all licenses required by any
governmental agency and to comply with all applicable laws and
regulations in its performance under this Agreement, including
export control, maintained by U.S. Commerce Department’s Bureau
of Industry and Security (BIS) and the U.S. Treasury Department’s
Office of Foreign Assets Control (OFAC), international boycotts
regulations and all anti-corruption laws, including the U.S. Foreign
Corrupt Practices Act (FCPA). The customer understands that U.S.
Government authorization may be required to export the software,
commodity or technology, or to re-export or re-transfer to a third
country, another end-user or another end-use. The customer agrees
to assume all such obligations.