HP Hitachi Dynamic Link Manager Software User Manual
Page 157

3. Creating an HDLM Environment
135
Then, execute the following command at the
ok
prompt in all nodes:
boot
Note
You must restart the host immediately after a successful upgrade installation
or re-installation has been confirmed.
8.
Execute the
dlnkmgr
command's
view
operation to display the status of the
programs.
The following shows an example of executing the command:
# /opt/DynamicLinkManager/bin/dlnkmgr view -sys
HDLM Version :
x.x.x-xx
Service Pack Version :
Load Balance : on(rr)
Support Cluster :
Elog Level : 3
Elog File Size (KB) : 9900
Number Of Elog Files : 2
Trace Level : 0
Trace File Size(KB) : 1000
Number Of Trace Files : 4
Path Health Checking : on(30)
Auto Failback : on(1)
Intermittent Error Monitor : off
HDLM Manager Ver WakeupTime
Alive
x.x.x-xx
yyyy
/
mm
/
dd
hh
:
mm
:
ss
HDLM Alert Driver Ver WakeupTime ElogMem Size
Alive
x.x.x-xx
yyyy
/
mm
/
dd
hh
:
mm
:
ss
4096
HDLM Driver Ver WakeupTime
Alive
x.x.x-xx
yyyy
/
mm
/
dd
hh
:
mm
:
ss
License Type Expiration
Permanent -
KAPL01001-I The HDLM command completed normally. Operation
name = view, completion time =
yyyy
/
mm
/
dd
hh
:
mm
:
ss
#
• The set values that were effective for each function before the update are
inherited as they are.
If you performed an upgrade installation from HDLM 05-00 or 05-01, the
load-balancing setting will remain
on
if it was previously set
on
, and the
algorithm will be
rr
(round robin). If you performed an upgrade installation
from HDLM 05-02 or later, the setting and algorithm will be inherited if the