Nearline 10 system power-on procedure

Nearline 10 system power-on procedure

Power on Nearline

K2 SAN

Power on and verify

control point PC

.

Refer to

page 363

for procedures.

Power on and verify

HP ProCurve switch

.

Refer to

page 363

for procedures.

Power on and verify

RAID devices

.

Refer to

page 363

for procedures.

Elapsed time: 5 minutes

Elapsed time: 1 minute

Power on any Nearline
K2 Media Server.

From the control point PC, at
the command prompt, ping
the K2 Media Server.

Nearline K2 SAN power-on

complete

No

Yes

Power on the other K2
Media Server.

From the control point PC, at
the command prompt, ping
the K2 Media Server.

No

Yes

K2

Media Server

responds to ping?

Elapsed time:

3 minutes

K2

Media Server

responds to ping?

Elapsed time:

3 minutes

No

Yes

Redundant

(NL10R)

servers?