Nearline 10 system power-on procedure – Grass Valley K2 Summit Storage Area Network v.7.1 User Manual
Page 362

26 October 2009
K2 Storage Area Network Installation and Service Manual
362
Nearline 10 system power-on procedure
Nearline 10 system power-on procedure
Power on Nearline
K2 SAN
Power on and verify
control point PC
.
Refer to
page 363
for procedures.
Power on and verify
HP ProCurve switch
.
Refer to
page 363
for procedures.
Power on and verify
RAID devices
.
Refer to
page 363
for procedures.
Elapsed time: 5 minutes
Elapsed time: 1 minute
Power on any Nearline
K2 Media Server.
From the control point PC, at
the command prompt, ping
the K2 Media Server.
Nearline K2 SAN power-on
complete
No
Yes
Power on the other K2
Media Server.
From the control point PC, at
the command prompt, ping
the K2 Media Server.
No
Yes
K2
Media Server
responds to ping?
Elapsed time:
3 minutes
K2
Media Server
responds to ping?
Elapsed time:
3 minutes
No
Yes
Redundant
(NL10R)
servers?