beautypg.com

Level 10r, 20r, 30r, 35r system power-on procedure – Grass Valley K2 Summit Storage Area Network v.7.1 User Manual

Page 360

background image

26 October 2009

K2 Storage Area Network Installation and Service Manual

360

Level 10R, 20R, 30R, 35R system power-on procedure

Level 10R, 20R, 30R, 35R system power-on procedure

Power on K2 SAN

Power on and verify

control point PC

.

Refer to

page 363

for procedures.

Power on and verify

HP ProCurve switches

.

Refer to

page 363

for procedures.

Power on and verify

RAID devices

.

Refer to

page 363

for procedures.

Elapsed time: 5 minutes

Elapsed time: 1 minute

Power on the K2 Media
Server that you want to be
primary. For 7.x SAN, it is
not required that this be the
server that was primary
when you last powered down
the K2 Storage System.

From the control
point PC, in the K2
System
Configuration
application, open

Server Control

Panel

.

Put the K2 Media Server into service:
In Server Control Panel, click

Start

.

No

In Server Control Panel,
check all indicators.

Yes

No

Yes

Green

indicator?

Elapsed time:

30 seconds

In Server
Control Panel,
check the file
system server
indicator.

Green

indicators?

Elapsed time:

10 seconds

Continue with next page of power-on procedure

This manual is related to the following products: