beautypg.com

Kofax Getting Started with Ascent Xtrata Pro User Manual

Page 557

background image

Chapter 7

538

Ascent Xtrata Pro User’s Guide

Figure 7-16. Running Synchronization

When synchronization is finished, the Synchronization tool closes automatically and
returns to the Ascent Capture Administration module. The batch class must be
published before the settings take effect for new batches.

Adding Ascent Xtrata Pro Validation to a Batch Class

Ascent Xtrata Pro Validation can be added to any Ascent Capture batch class.
Normally, Ascent Xtrata Pro Validation should be positioned right after Ascent
Xtrata Pro Server.

Note

You do not need to synchronize the validation settings defined in an Ascent

Xtrata Pro project with the batch class.