beautypg.com

Gasboy SiteOmat Maintenance Manual User Manual

Page 90

background image

86

SiteOmat Setup and Maintenance Manual – MDE 4817G

Figure 4-25. Setup Pump Settings Dialog Box

2. Enter the actual Number of nozzles and click Save to save the changes and close the dialog

box

3. Configure each nozzle (hose) to the actual tank the nozzle is connected to

4. Define if the specific nozzle (hose) is Active. If the checkbox is unchecked, refuel process

from this nozzle isn't authorized

5. In cases where the Controller includes a Vehicle Identification System, enter its data transfer

channel. Each hose is linked to a specific F.P. Plus Channel to be selected from the

drop-down list.

6. Enter the cut off delay, which is the waiting time, in seconds, before stopping the pump

when no VIU is detected

7. For pumps that support Satellite linked nozzles, (two nozzles connected to the same pump

head allowing simultaneous refuel from both sides of a truck), select the F.P. Plus Channel

from the Satellite drop down list

8. Click on the Reload button, in order to finish the Setup process.