Spectra Precision Survey Pro CE v3.6 User Manual User Manual
Page 98
User’s Manual
92
9. To select a break-line, tap the
%UHDNOLQHV«
button to open the Add/Edit Break-lines
screen. If any break-lines have already
been selected, they will be listed in this
screen.
a. To add an existing break-line, tap the
$GG ([LVWLQJ« button. This will
display all the polylines in the current
job. Select the desired polyline and tap
2.. This will move the selected
polyline to the DTM layer.
b. When finished adding break-lines, tap
&ORVH to return to the
Setup DTM 3D screen.
10. When you return to the Setup DTM 3D screen, the
3RLQWV«
button will open the Points on DTM Layer screen where the
points on the DTM layer can be viewed, new points can be
imported, and existing points can be deleted (moved to the
Auxiliary layer). The
' 9LHZ« button will open the 3D View
screen where the DTM surface for the points on the DTM layer
can be viewed from any angle.
11. This completes the Stake DTM set up procedure. Tap
&ORVH
from the Setup DTM 3D screen to return to the Stake DTM
screen.