Set up – Spectra Precision Survey Pro CE v3.6 User Manual User Manual
Page 66
User’s Manual
60
Set Up
1. Open the job that was created in the Traverse / Side Shot
Example if it is not already open.
a. From the Main Menu, select
)LOH , 2SHQ 1HZ to open the
Open / New screen.
b. Tap the file name that was created
earlier listed in the
Open Recent Job
list
and then tap
2SHQ . The coordinates for
that job are shown here.
2. Set the job settings. (Only the settings that
affect this example are covered here.)
a. Select
-RE , 6HWWLQJV from the Main
Menu.
b. Select
the
Instrument Settings
screen and
set both the
Brand
and
Model
fields to
Manual Mode
.
c. Select
the
Surveying Settings
screen and confirm that all of
the checkboxes are unchecked.
d. Select
the
Stakeout Settings
screen and make sure the
Cut
Sheet Offset Stored
field (at the bottom of the screen) is set to
Actual Offset
.
Note: When performing stakeout, you have the option of storing cut
sheet information. This information is stored in the raw data file,
and when using software on a PC, such as Survey Link, it can be
extracted in the form of a Cut Sheet Report.
e. Tap
2. to save the job settings.
3. Setup your backsight. In this example, we will setup on Point 1
and backsight an object with a known azimuth. When connected
to a total station, you would setup over your occupy point, aim
toward the backsight and zero the horizontal angle in the total
station before continuing.