Curve and offset – screen two – Spectra Precision Survey Pro CE v3.6 User Manual User Manual
Page 289
Survey Pro Reference Manual
R-132
Curve and Offset – Screen Two
Station to Stake
: is the desired station on the
curve that you want to stake.
Station Interval
: is the value that is added to the
Station to Stake
after the
1H[W 6WDWLRQ button is
pressed.
1H[W 6WDWLRQ : advances the
Station to Stake
by
the
Station Interval
.
Offset
: is the horizontal distance of the offset
from the specified curve. The offset occurs on the
left (while viewing the curve from the PC) when
the
L
is selected or on the right when the
R
is selected.
Note: An offset of zero would result in the specified curve being
staked.
9 2IIVHW : will result in the elevations for the design points to be
adjusted by the value entered here and will change the cut / fill
values accordingly. Design elevations will be lower when
D
is
selected, and higher when
U
is selected.
*UDGH : specifies a slope from the specified curve to the curve that
is being staked. When this is a non-zero value, the elevation for the
staked points will increasingly differ from the corresponding design
elevations on the specified curve as the
Offset
value increases.
Height of Rod
: is the length of the rod.
%DFN : returns to the previous screen.
6ROYH! : accesses the third Stake Curve and Offset screen, described
next.
Note: A motorized total station will automatically turn toward the
design point after tapping
6ROYH! , depending on the configuration of
the Stakeout Settings screen (Page R-33).